免费二级c片在线观看a_欧美中文字幕在线视频_黑人亚洲娇小videos_日韩人妻少妇精品无码专区_18禁毛片永久免费观看_色视频www在线播放_无码综合乱伦免费_国内自拍第五一页_激情五月天综合天堂_亚洲日韩精品无码专区加勒比☆

phone/wechat/what's app: +86-18653810085

Email: hongyuanmakela@163.com

Taian Hongyuan Geosynthetics Co., Ltd.
Tel:18653810085

News Current Position:Home > News

What are the requirements for the base surface when laying GCLs?

Release time:2020-4-7    This article is read :2906 Times

Taian Hongyuan Geosynthetics Co., ltd.

Taian Hongyuan Geosynthetics Co., ltd. has been engaged in the production and sales of GCLs for many years, what are the requirements when laying the base surface. Taian Hongyuan Geotechnical Materials Co., Ltd., as a manufacturer of GCLs, let the editors take you together to understand what are the requirements for the base surface when laying GCLs?

1. The surface of the foundation soil should be free of mud, water, stones, tree roots, debris and other substances that can damage the GCL (GCL) or the upper layer of geosynthetics.

2. The surface of the foundation soil needs to be flat, uniform and the slope and elevation are within the allowable error range specified in the relevant earthwork technical specifications. The quality of the base surface should meet the design requirements: the bottom surface of the foundation pit, the slope surface and its slope ratio, the solid laid on the side slope, and the treatment of the junction between the slope surface and the bottom surface should all strictly meet the design requirements.

The base surface should facilitate the laying of GCL (GCL), HDPE geomembrane and geotextile. The base surface should be dry, compacted, smooth, without cracks, without obvious spikes, depressions, and there should be no roots, rubble, stones, steel heads, glass chips within a vertical depth of 25mm. The flatness should be changed gently within the allowable range, the slope is uniform, the slope is consistent, and meets the design requirements of the drawings. The yin and yang corners on the base surface should have a smooth transition, and the radius should not be less than 0.5 meters.

3. Before laying the GCL (GCL), whether the upper surface of the foundation of the soil cushion (GCL) should be laid meets the design requirements, and agree that the foundation soil surface is allowed to be laid with the GCL (GCL).

4. After the daily work, we prepare a signed foundation soil surface permit certificate, which needs to be signed by the owner ’s representative and then handed over to the supervision engineer.

5. If the supervision engineer, the owner or one of us thinks that any of the ground soil surfaces of the GCL (GCL) that has been accepted becomes unqualified, the installed GCL (GCL) needs to be reopened and re-prepared 3. Re-check in accordance with the aforementioned acceptance procedures on the foundation.

What are the requirements for the base surface when laying GCLs?
Previous:How to check the quality of the construction of GCL?next:Construction notes of GCL

Contact Us:

WeChat public account

Taian Hongyuan Geosynthetics Co., Ltd.

Phone / Wechat / What's app:+86-18653810085

Telephone / Fax: + 86-538-6598877

Email:  hongyuanmakela@163.com

Website: baodingyitong.com.cn

Address: Jinghua Industrial Zone, NO. 88 Leigushi Street, Taishan Industrial Park, Taian City, Shandong Province, China

Copyright? Taian Hongyuan Geosynthetics Co., Ltd.            Lugong Network Security No. 37090202000491            Lu ICP No. 16042524-1           公示信息